Listed building consent in Edinburgh, and the surveys it can call for
The City of Edinburgh Council decides more listed building and conservation area consent applications than any other planning authority in Scotland: 959 in 2024/25, more than twice Glasgow’s 410, according to the Scottish Government’s planning statistics. There is no fee for listed building consent in Edinburgh.
In some cases the council’s listed buildings and conservation areas guidance asks for a survey of a different kind. Before it approves replacing original windows, it wants a professional survey with photographs showing they are beyond repair. Where the case for demolishing a listed building is that it cannot be repaired and reused, it wants that shown by a detailed structural condition survey report. Both are about condition. A measured survey records the size and shape of the building as it stands, which is what the existing drawings are made from. Our guide to measured surveys of listed buildings in Scotland sets out what those drawings should record.
Settling the drawing list before an Edinburgh application
For a householder application, the council’s Guidance for Householders (September 2025) says the drawings needed depend on the scale, nature and location of the proposal, and that proposed works should be coloured and annotated with their dimensions and materials. The same guidance says drawings added after an application has been validated are not accepted unless the case officer agrees. So the list of existing drawings is worth settling with your designer before the survey, not after the application goes in.
With that list in hand, we scope the survey to it at quote stage. Our guide to briefing a measured building survey has a checklist for the rest of the brief: what the survey is for, how far it extends, the accuracy, the drawings and the file formats.