A measured building survey measures a building so that it can be drawn. A building survey reports on its condition. A Home Report is the pack a seller in Scotland must hold, with a single survey and valuation by an RICS surveyor. A topographical survey maps a site: its ground levels and the features on it.

By Connor Milton MCIAT, Chartered Architectural Technologist Published Last reviewed 8 minute read

How do the four surveys differ?

Each one answers a different question. A measured building survey gives the size and shape of a building. A building survey reports on its condition. A Home Report tells a buyer in Scotland about a home that is on the market. A topographical survey maps the ground and the features of a site.

SurveyWhat it recordsWho carries it outWhat you receive
Measured building surveyMeasurements of an existing building, so that plans, elevations or sections can be drawnA measured survey provider, usually briefed against the RICS standard Measured surveys of land, buildings and utilitiesDrawings, and where the brief asks for them a 3D or BIM model or a registered point cloud
Building survey (RICS Home survey level three)The structure and fabric of a home, visible defects, potential problems from hidden flaws, and repair optionsAn RICS surveyor licensed to carry out RICS Home surveysA written report, with no valuation unless one is added
Home Report (Scotland)A single survey and valuation, an energy report with an Energy Performance Certificate, and a property questionnaireThe survey: a surveyor registered with or authorised to practise by RICS. The questionnaire: the seller, or someone the seller authorises to act for themThree documents the seller holds and gives to potential buyers who ask
Topographical surveyThe ground of a site, with levels, and the features on it: buildings at plinth level, roads, kerbs, walls, fences, trees and visible coversA land survey firmA 2D or 3D survey drawing, and where asked for a digital terrain model, contours, a point cloud or a survey report

What does a measured building survey record?

The building as it stands, measured so that it can be drawn. The Survey Association’s client guide defines a measured building survey as collecting measured data so that plans, elevations or sections can be drawn, delivered as 2D drawings or, more commonly, as a 3D model. It lists uses including sale and letting, valuation, facilities management, alterations, fire plans, licensing, rights of light and party walls, and warns that a survey made for one purpose may not be accurate or detailed enough for another.

It measures the building. It gives no opinion on the building’s condition and puts no value on it. Our guide to what a measured building survey is covers the outputs, the methods and the accuracy a brief can ask for, and our guide on how to choose a measured survey provider lists the questions to ask one.

Floor areas for a sale, a letting or a valuation are a separate matter again. RICS sets out how they are measured in its Code of Measuring Practice, which defines gross external, gross internal and net internal area and describes itself as “a code of measurement, not a code of valuation”. How an area is measured is a different question from how accurate a survey is.

What is a building survey?

A report on the condition of a building, not a set of measurements. For homes, RICS describes three levels of RICS Home survey, carried out by RICS members licensed to provide them. RICS says the third level was previously called a building survey.

RICS Home surveyWhat RICS says it coversValuation
Level oneThe condition of the building, its services and outbuildings, with ratings, a summary of risks and matters for your legal adviserNot included
Level twoLevel one, plus a more extensive inspection, advice on repairs and maintenance, and problems that may affect the valueIncluded only in the “survey and valuation” version, which adds a market value and a reinstatement cost figure
Level threeDetailed information about the structure and fabric: a thorough inspection, visible defects, potential problems caused by hidden flaws, and repair options with the likely consequences of not actingNot included, but one may be provided as an extra service

The inspection is visual. RICS says your surveyor will report on the parts of the home that can be easily reached and seen, and that at level one no tests of the building fabric or services are made. It also points out that a mortgage lender’s valuation is not a survey: it is a limited check on the home, carried out by the lender, that it is worth the money lent.

For a building survey, go to an RICS surveyor. RICS runs a Find a Surveyor site for the public.

What is a Home Report?

The set of documents about a home that, in Scotland, must be held for a house on the market. Section 98 of the Housing (Scotland) Act 2006 requires the person responsible for marketing a house to have the prescribed documents for it. Home Report is the name the Scottish Government and RICS give to those documents.

The Scottish Government’s mygov.scot site describes three parts:

  1. A single survey and valuation. Based on a visual inspection by a chartered surveyor, it covers the home’s condition, its accessibility and repairs that may be needed, and gives a valuation.
  2. An energy report. The home’s energy efficiency, in the form of an Energy Performance Certificate.
  3. A property questionnaire. It covers 16 categories, to give more information about the home.

Under the 2008 regulations, only surveyors registered with or authorised to practise by the Royal Institution of Chartered Surveyors may prepare the survey report, and the questionnaire is prepared by the seller or by someone the seller authorises to act for them. A potential buyer can ask for a copy, and the seller or selling agent must provide it within nine days. The Act lifts that duty where the person marketing the house reasonably believes the person asking is unlikely to be able to afford it, is not genuinely interested in buying, or is not someone the seller is likely to be prepared to sell to.

RICS says the Home Report is commissioned by the seller but can be relied on by the buyer, and that a buyer who wishes can still instruct their own survey. The regulations also list exceptions, among them new housing, newly converted premises, and seasonal and holiday accommodation.

What is a topographical survey?

A map of a site: the shape of the ground, with levels, and the features on and around it. The RICS standard Measured surveys of land, buildings and utilities gives topographic surveys their own section, beside its section on measured building surveys. The client uses it to say which features are surveyed and to what accuracy band.

The standard’s checklist of features runs from buildings detailed at plinth line, with spot heights at their corners, to roads, paths and kerbs, walls, fences, gates and hedges, street furniture, utility covers where they can be seen, trees and the limits of vegetation, water features and earthworks such as banks. Floor and threshold levels are surveyed only if the client asks for them. The outputs the client can tick include a 2D or 3D topographic survey, a digital terrain model, contours, a registered point cloud, cross sections and a survey report.

The Survey Association’s client guide for architectural services says the first thing to decide when specifying a topographical survey is the scale. Most medium sized surveys are captured at 1:200 or 1:500, and larger sites may be captured at 1:1250 or even 1:2500. A grid of spot levels at 5 m spacing needs a 1:200 survey, and at 1:500 the spacing grows to 10 m. The RICS standard sets accuracy by band rather than by scale: our guide to measured survey accuracy bands explains them.

In Scotland a council may ask for one with a planning application. The national validation guidance from Heads of Planning Scotland lists a topographical survey, showing existing and proposed site levels, among the documents a planning authority may need, depending on the scale and nature of the proposal, and where site levels plans are needed, asks for them at 1:200 or 1:500 with a fixed datum off the site. It advises checking with the planning authority early. Our guide to existing drawings for planning and building warrants covers the drawings of the building itself.

Buried services are a separate survey. The Survey Association’s guide says manhole and inspection covers, with the pipes in and out, may be shown on a topographical survey, but tracing electricity or gas services may need additional tools and methods. The RICS standard treats the detection of buried pipes and cables as an underground utility survey, whose results are drawn on a topographical survey.

For a topographical survey, go to a land survey firm. The Geospatial Survey Association, formerly The Survey Association, represents UK surveying companies, and its Find a surveyor search works by area, with Scotland as one of the areas.

Can a topographical survey and a measured building survey be combined?

Yes. The RICS standard says its topographic section deals with the area around a building and the survey control outside it, its measured building survey section deals with the inside and outside of the building, and the two can be combined if necessary. The Survey Association’s guide adds that when one job has both, the survey control on the site must suit the more accurate of the two.

What this guide cannot tell you

It describes each survey from the published sources listed below. It is not advice on which survey to commission for a purchase or a project: put that question to the right professional for the survey concerned. The RICS home survey levels described here are for homes, and come from RICS’s consumer guide and its Find a Surveyor site. The Home Report rules come from the 2006 Act and the 2008 regulations as legislation.gov.uk publishes them.

Checked against the sources below on the dates they were read, most recently 20 November 2026. Rules change: read the source before you rely on it.

How Kanna Spatial does it

Kanna Spatial is a reality capture studio in Glasgow. We carry out measured building surveys and point cloud surveys. One site visit can combine a laser scan, an interior capture and drone photographs. We draw the plans, elevations and sections in CAD from that capture. Drawings follow your CAD layer standard or Revit template, on sheets at 1:50 or 1:100 in DWG and PDF. Tolerance is agreed at quote stage to suit the scale and purpose of the drawings. Every drawing is checked before issue.

The West End townhouse case study shows a full set: nine sheets at 1:50 in DWG and PDF, from one site visit.

Every job is quoted at a fixed price before we attend, usually the same working day. Ask for a fixed price and tell us what the drawings are for.

Questions

Is a measured building survey the same as a building survey?

No. A measured building survey measures a building so that it can be drawn. A building survey reports on its condition. RICS says its Home survey level three was previously called a building survey.

Who prepares the survey in a Home Report?

Under the 2008 regulations, only surveyors registered with or authorised to practise by the Royal Institution of Chartered Surveyors. The seller commissions the Home Report, and RICS says a buyer can rely on it.

Does a topographical survey show underground pipes and cables?

It shows what can be seen, such as manhole and other utility covers. Finding buried pipes and cables is an underground utility survey, and the RICS standard has its results drawn on a topographical survey.

Sources

14
  1. Client guide to measured building surveys, Issue 4The Survey Association (now the Geospatial Survey Association). Read
  2. Measured surveys of land, buildings and utilities, 3rd edition (PDF)RICS. Read
  3. Code of Measuring PracticeRICS. Read
  4. Client guide to survey specification for the provision of architectural services, Issue 1The Survey Association (now the Geospatial Survey Association). Read
  5. Guidance on the national standards for the validation and determination of planning applicationsHeads of Planning Scotland. Read
  6. Consumer guide: RICS Home surveysRICS. Read
  7. RICS Home survey level threeRICS Find a Surveyor. Read
  8. Helping you choose the right surveyRICS Find a Surveyor. Read
  9. Consumer guide: Buying a home in ScotlandRICS. Read
  10. Housing (Scotland) Act 2006, sections 98 and 99legislation.gov.uk. Read
  11. The Housing (Scotland) Act 2006 (Prescribed Documents) Regulations 2008legislation.gov.uk. Read
  12. Home Reportmygov.scot. Read
  13. Home ReportsScottish Government. Read
  14. Geospatial Survey Association, home page and Find a surveyorGeospatial Survey Association. Read

Proof

Projects we can show you

All case studies

Get a price

Get a fixed price, usually the same working day

Send the address and what you need. No call needed: we reply with a price and a survey date.

What happens next

  1. 01We reply with a fixed price, usually the same working day.
  2. 02We agree a survey date.
  3. 03You receive everything in your client portal.

Prefer email? studio@kannaspatial.co.uk

What do you need?
Get a fixed price Email