What is an accuracy band?
An accuracy band is a lettered class, from A to J, that sets how accurately each surveyed point must sit relative to the survey control. The bands come from the RICS document Measured surveys of land, buildings and utilities, 3rd edition. It took effect on 8 December 2014 and was reissued in December 2023 as an RICS professional standard, which RICS members must comply with. It is also written for clients who specify their own surveys, so anyone can name a band in a brief.
Earlier editions tied accuracy to the scale a drawing would be plotted at. The 3rd edition sets accuracy for surveyed features independent of plot scale, partly so the data suits BIM and other digital uses. Each value in its band table is the accuracy of a single survey point measured against the survey control points, and site checks of that accuracy must measure to or from the control.
When you commission a measured building survey, the band is how the brief states the accuracy you need. The client guide to measured building surveys from The Survey Association (now the Geospatial Survey Association) says measured building professionals regard the RICS document as the ultimate reference source.
What do one sigma and two sigma mean?
They are the two confidence levels at which the bands are stated. At one sigma, about 68% of measurements fall within the stated value. At two sigma, about 95% do. RICS adds that 99.7% fall within three times the one sigma value.
So one band carries two plan figures. Band D is ±10 mm at one sigma and ±20 mm at two sigma. Neither is a limit that no point may pass: even at two sigma, about 5% of points can fall outside the value.
RICS gives its own example. A client who needs 10 mm plan accuracy at 95% confidence should choose band C, which is ±10 mm at two sigma. When you compare figures from different documents, or from equipment makers, check which confidence level each one is stated at.
Which bands apply to buildings?
In the RICS examples, bands B to G. RICS lists measured building surveys among the example uses of those six bands: high accuracy measured building work in B and C (with heritage recording in C), measured building surveys in D and E, and low accuracy measured building surveys in F and G. The example uses of band A are monitoring, high accuracy engineering setting out and fabrication surveys, and those of bands H to J include topographic, mapping, utility and route surveys. RICS says its examples are not a complete list and are not fixed to a band.
The table gives the plan and height values for bands B to G from the RICS band table. Height values are at one sigma: RICS says to double them for two sigma.
| Band | Plan, one sigma | Plan, two sigma | Height, hard detail | Height, soft detail | Legacy plot scale |
|---|
| B | ±4 mm | ±8 mm | ±4 mm | ±8 mm | 1:10 |
| C | ±5 mm | ±10 mm | ±5 mm | N/A | 1:20 |
| D | ±10 mm | ±20 mm | ±10 mm | ±25 mm | 1:50 |
| E | ±25 mm | ±50 mm | ±10 mm | ±50 mm | 1:100 |
| F | ±50 mm | ±100 mm | ±50 mm | ±100 mm | 1:200 |
| G | ±100 mm | ±200 mm | ±50 mm | ±100 mm | 1:500 |
What are hard detail and soft detail?
They are the two height columns of the band table. The table gives one height accuracy for hard detail and another for soft detail, and where it gives a soft detail value, it is the looser of the two. In band D that is ±10 mm for hard detail and ±25 mm for soft detail, both at one sigma. In bands A and C the soft detail column reads N/A.
The table does not say which features count as hard detail and which as soft. If particular heights matter to your design, name those features in the brief and ask how they will be surveyed.
How do accuracy bands relate to 1:50 and 1:100 drawings?
Only as a rough guide. RICS keeps the legacy plot scale column so that users of earlier editions can see which plot scale used to go with each band: 1:50 sits beside band D and 1:100 beside band E. The band, not the scale, is what you specify. A drawing scale on its own sets no tolerance.
Scale still matters for detail. RICS says the band table does not decide how much detail is drawn, though it does give the smallest feature shown true to shape rather than as a symbol. The Survey Association’s client guide gives examples: strictly, a 1:100 survey need not show window sill and head heights, though survey professionals include them as key dimensions, and dado rail and cornice profiles are expected at 1:25 but not necessarily at 1:100. Detail beyond the standard should be asked for at tender.
The scales a planning or building warrant application normally asks for are a separate question, covered in our guide to existing drawings for planning and building warrant.
How do you specify accuracy in a brief?
The RICS specification for measured building surveys asks the client to state one default band for the job, then list any features to be surveyed at a different band or not surveyed at all. A brief that does this sets out:
- The default band, for example band D.
- Any features at a different band, and any to be left out.
- The type of survey. The Survey Association’s guide describes three types: a connected survey ties all floors to one control framework and is usually asked for when major structural change is planned; a semi-connected survey controls one floor, normally the ground floor, and matches the others by assuming common features are vertical; an unconnected survey cannot relate one part to another.
- The drawings, their scales and any detail beyond the standard.
- What the drawings are for. The same guide warns that a survey made for one purpose may not be accurate or detailed enough for another.
Our guide to briefing a measured building survey has a fuller checklist, and our guide to choosing a measured survey provider in Scotland covers what to ask before you appoint one.
Other specifications you may see
In England, Historic England publishes its own Geospatial Survey Specifications for Cultural Heritage (HEAG317, January 2024). It sets precision by output scale at one sigma, checked from the nearest control point: for example ±15 mm at 1:50 and ±30 mm at 1:100. It is the specification for Historic England’s own framework of survey services, not a Scottish requirement, so treat it as a reference only.
The US Institute of Building Documentation (USIBD) publishes a separate scheme, the Level of Accuracy (LOA) Specification, now at version 3.1. If a brief uses LOA levels rather than RICS bands, ask which document and which version it means before you compare figures.
What an accuracy band cannot tell you
A band is a requirement for the finished survey points, checked against the survey control. It says nothing about the instrument. Scanner makers rate their equipment under test conditions: Leica states its RTC360 accuracy figures at 68% confidence, one sigma, on a very bright target, and its 3D point accuracy figure grows with range. A rating like that is not the accuracy of a survey, a drawing or a model.
A band also does not make a survey fit for a purpose it was not briefed for.
How Kanna Spatial does it
Kanna Spatial is a reality capture studio in Glasgow. Led by a Chartered Architectural Technologist (MCIAT). We take the RICS document as the reference for your brief.
Tolerance is agreed at quote stage to suit the scale and purpose of the drawings. If your brief names an RICS accuracy band, send it with your enquiry and we will tell you whether and how we can meet it. We scan with a Leica RTC360, rated by Leica at 1.9 mm 3D point accuracy at 10 m. That is Leica’s one sigma rating of the scanner, not the accuracy of a survey. Every drawing is checked before issue.
For an example of a finished set, see the West End townhouse case study. Every job is quoted at a fixed price before we attend, usually the same working day. Send us the address and your brief.