Measured surveys and scanning
Scan to BIM LOD explained: what LOD 200, 300 and 350 mean for an existing building
In short
LOD 200, 300 and 350 are BIMForum levels of development. They say how far a modelled element can be relied on: approximate at LOD 200, measurable at LOD 300, and measurable with its interfaces at LOD 350. For scan to BIM of an existing building, agree the LOD of each element and its tolerance against the point cloud.
- 1LOD 200: generic element, approximate size, shape and location
- 2LOD 300: size, shape and location can be measured
- 3LOD 350: as LOD 300, plus its interfaces with other elements
On this page
What does LOD mean in scan to BIM?
LOD stands for level of development. In the BIMForum Level of Development (LOD) Specification, it is the degree to which the people using a model can rely on the information in an element. Level of detail is a different thing: BIMForum describes it as how much detail is put into an element. When a scan to BIM brief asks for a Revit model of an existing building at LOD 300, it is using BIMForum’s scale.
BIMForum is a US body. Its specification builds on the LOD definitions of the American Institute of Architects (AIA), now those in AIA E201-2022, and it has been issued roughly every year since 2013. The latest edition is the 2025 one.
BIMForum notes that some countries use “level of detail” for the idea it calls level of development, and number it differently. If a brief or an information requirement uses LOD, check which scale it means.
One rule shows the difference between the two ideas. An element that is highly detailed and geometrically accurate, but not located accurately, can be no higher than LOD 200.
LOD 200 vs LOD 300 vs LOD 350: what is the difference?
The difference is how far you can measure from the element. Anything taken from an LOD 200 element is approximate. At LOD 300 the element’s size, shape, location and orientation can be measured from the model. LOD 350 adds its interfaces with the elements next to it or depending on it. The drawing at the top of this page shows one wall and window at each of the three levels.
The table sets out all six levels as the 2025 specification gives them: the AIA E201-2022 definitions, with BIMForum’s notes.
| LOD | What BIMForum says the element is | What you can take from it |
|---|---|---|
| 100 | A symbol or other generic representation. It need not be geometry at all | Anything derived from it is approximate |
| 200 | A generic element with approximate quantity, size, shape, location and orientation, recognisable as 3D geometry | Anything derived from it is approximate |
| 300 | The element as designed, modelled so that its quantity, size, shape, location and orientation can be measured | Measurements. BIMForum notes that LOD 300 elements are not necessarily clash free |
| 350 | As LOD 300, plus its interfaces with adjacent or dependent elements can be measured | Coordination for construction, which LOD 350 is meant to support |
| 400 | Detail sufficient for fabrication, assembly and installation, about the level of shop drawings | BIMForum says most models contain few if any elements at this level |
| 500 | An existing or as-constructed condition, developed by observation, field verification or interpolation, with its accuracy stated | That the geometry was observed, not designed. It is not a level above LOD 400 |
Which LOD applies to an existing building?
In BIMForum’s own terms, LOD 500. In the current definitions, LOD 100 to 400 describe elements as designed, and LOD 500 describes an existing or as built condition, with the accuracy of the element stated. BIMForum says LOD 500 does not indicate a higher level than LOD 400: it records that the geometry was observed rather than designed. For stating the accuracy, BIMForum recommends the Level of Accuracy (LOA) Specification of the US Institute of Building Documentation, now at version 3.1.
So when a brief for a model of an existing building asks for LOD 200, 300 or 350, it is using BIMForum’s descriptions to say how far each element can be relied on. What LOD 500 adds is the accuracy. A brief that names a level and no tolerance leaves that out. On our jobs the accuracy is stated as a tolerance against the point cloud, agreed at quote stage.
How the accuracy of a survey itself is specified is a separate question, covered in our guide to measured survey accuracy bands.
Can a whole model be LOD 300?
A brief can ask for one, but BIMForum’s levels describe model elements, not whole models, and the specification does not say which level should be reached at which point in a project. One model can hold elements at different levels. So the useful brief names the level element by element.
What should a scan to BIM brief say about LOD?
- The elements to be modelled. Walls, floors, roofs, stairs and openings, and anything else the design needs from the existing building.
- The LOD of each element. Name the specification and its edition, for example LOD 300 under the BIMForum LOD Specification 2025.
- The tolerance against the point cloud. BIMForum’s LOD 500 asks for the accuracy to be stated, and the LOD alone does not give it.
- The Revit version and template. Revit cannot save a model back to an older version, so agree the version before modelling starts.
- Your BIM execution plan, if there is one. BIMForum says its specification does not replace a BIM execution plan: it is meant to be used alongside one.
For the survey that comes before the model, our guide to briefing a measured building survey has a checklist.
How do LOD, level of information need and ISO 19650 differ?
They answer different questions. Level of information need is set out in ISO 7817-1:2024, published in the UK as BS EN ISO 7817-1:2024 on 31 July 2024. It is a method for specifying how much detail and what extent of information is to be exchanged and delivered over the life of a built asset. The earlier European standard with the same title, BS EN 17412-1:2020, was withdrawn on 4 July 2024 and superseded by it, so a brief that cites BS EN 17412-1 cites a withdrawn standard.
The 2025 BIMForum specification maps LOD 100 to 400 onto the aspects ISO 7817-1 requires: detail, dimensionality, location, appearance and parametric behaviour. For LOD 500 it gives no mapping, and says that ISO 7817-1 does not address the modelling of existing conditions.
ISO 19650 sets out how BIM information is managed and exchanged on a project. It does not set survey accuracy.
What LOD does not tell you
- How accurate the geometry is. LOD says how far an element can be relied on. The accuracy of an observed element is stated separately, as BIMForum’s LOD 500 asks.
- What is hidden. A laser scan records the surfaces in view. No LOD can put a beam or a pipe into the model if it sits inside a wall, floor or ceiling the scanner never saw, unless that part is opened up.
- Whether elements clash. BIMForum notes that LOD 300 elements are not necessarily clash free.
- Anything about condition. An element at LOD 300 can be measured. That says nothing about whether it is sound.
How Kanna Spatial does it
Kanna Spatial is a reality capture studio in Glasgow. We build Revit models of existing buildings from the registered point cloud. We agree the elements, their LOD, the tolerance against the point cloud and the Revit version at quote stage, and we agree LOD 200, 300 or 350 element by element. Send your BIM execution plan and information requirements at the start and we will work within them. Every drawing is checked before issue by a Chartered Architectural Technologist with ten years in architectural practice.
For how the model is built, step by step, see our guide to point cloud to Revit. Prices other firms publish are collected in our guide to scan to BIM costs in the UK.
For the service itself, see scan to BIM. Every job is quoted at a fixed price before we attend, usually the same working day. Send us the address, the LOD you need and your Revit version.
Questions
What LOD is a Matterport BIM file?
Matterport says the structural and architectural elements in its BIM file meet LOD 200, modelled from a black and white point cloud. By BIMForum's definition, anything measured from an LOD 200 element is approximate.
Which edition of the BIMForum specification is current?
The 2025 edition, dated 30 December 2025, is the latest BIMForum lists. It issues a new edition roughly every year, so name the edition in your brief.
When is LOD 350 worth asking for?
When the joints between elements matter as much as the elements. BIMForum says LOD 350 is meant to support construction-level coordination, and that designers rarely model elements above LOD 300.
Sources
- Level of Development (LOD) Specification
- Level of Development Specification 2025, Part I
- Level of Accuracy (LOA)
- BS EN ISO 7817-1:2024 Building information modelling. Level of information need. Concepts and principles
- BS EN 17412-1:2020 Building information modelling. Level of information need. Concepts and principles
- BS EN ISO 19650-1:2018 Information management using building information modelling. Concepts and principles
- Matterport BIM File
Get a price
Get a fixed price, usually the same working day
Send the address and what you need. No call needed: we reply with a price and a survey date.
What happens next
- 01We reply with a fixed price, usually the same working day.
- 02We agree a survey date.
- 03You receive everything in your client portal.
Prefer email? studio@kannaspatial.co.uk